BOM(Bill of Material)
ECOUNT's production management program can automatically calculate
the quantity of raw/sub materials required for production based on the BOM(Bill of Material).
Management of
production increase and
decrease using BOM
- Compose the number of raw/sub material required
to produce through the BOM. - The type and quantity of the raw/sub materials used
in the production is based on the BOM. - There is no need to manage the production
increase and decrease separately, as it is reflected
instantly when entering the goods receipt.
![Management of production increase and decrease using BOM](/us/common/images/product/production_bill-of-material-software/management-01-pc.png?ver=2024041801)
![Management of production increase and decrease using BOM](/us/common/images/product/production_bill-of-material-software/management-01-mobile.png?ver=2024041801)
Apply the company's BOM system
- Register multiple processes according to the company's production flow.
- Compose the BOM with various units like EA, SET, KG, etc.
- Easily upload the BOM data in bulk using the Excel uploader.
![Apply the company's BOM system](/us/common/images/product/production_bill-of-material-software/apply-01.png?ver=2024050901)
Smooth ordering of
raw/sub materials without
disruption to the
production schedule
- Predict the quantity of raw/sub materials needed
for production in advance based on the BOM. - Calculate the quantity of raw/sub materials to be
used in advance and reflect in the ordering
process.
![Smooth ordering of raw/sub materials without disruption to the production schedule](/us/common/images/product/production_bill-of-material-software/order-01-pc.png?ver=2024041801)
![Smooth ordering of raw/sub materials without disruption to the production schedule](/us/common/images/product/production_bill-of-material-software/order-01-mobile.png?ver=2024041801)
Comparison of BOM-based consumption and
actual consumption at a glance
- Apply the actual quantity of raw/sub materials consumed when inputting the production.
- Check the difference between the set BOM and the actual raw/sub materials used.
- Compare the cost based on actual consumption with the BOM-based cost.
![Comparison of BOM-based consumption and actual consupmtion at a glance](/us/common/images/product/production_bill-of-material-software/compares-01.png?ver=2024050901)