Master Production Schedule(MPS)
Establish production plans and manage the ordering schedule
according to the production schedule through the master production schedule.
Establishing production plans based on sales orders
- Create the MPS based on the sales order(outstanding s/o), sales forecast, etc.
- Plan the production while considering the safety stock and holidays.
![Establishing production plans based on sales orders](/us/common/images/product/production_master-production-schedule/establish-01.png?ver=2023102601)
Check production schedule at a glance
- View the production schedule on a daily and item basis.
- Also manually modify the schedule as needed based on the planned data.
Ordering raw/sub materials based
on production plan
- Link the master production schedule and MRP to check the quantity
and procurement timing of the necessary raw/sub materials. - Utilize the MRP to establish an optimal ordering plan and to
generate purchase orders based on it.
![Ordering raw/sub materials based on production plan](/us/common/images/product/production_master-production-schedule/order-01-pc.png?ver=2023102601)
![Ordering raw/sub materials based on production plan](/us/common/images/product/production_master-production-schedule/order-01-mobile.png?ver=2023102601)