MRP(Material Requirement Planning)
Using the MRP feature, plan the consumption of materials so that the raw/sub material will be sufficient
and purchase the optimal quantity needed in the production.
MRP(Material Requirement Planning) linked with
MPS(Master Production Schedule)
- Purchase the raw/sub materials needed in production according to the production schedule set
through MPS(Master Production Schedule). - MRP(Material Requirement Planning) will be set automatically based on the production plan.
![MRP(Material Requirement Planning) linked with MPS(Master Production Schedule)](/us/common/images/product/purchasing_material-requirement-planning/plan-01.png?ver=2024051001)
Establish a systematic purchase
process through automatic calculation
- The procurement period and quantity of the raw/sub materials can be decided
by applying safety stock, procurement period, holidays, etc. of the BOM. - The number of raw/sub materials used per day, number of materials to be
received, needed quantity, etc. will be calculated automatically. - Purchase plan is set automatically based on the MRP, and purchase order can
be created right away by linking this purchase plan.
![Establish a systematic purchase process through automatic calculation](/us/common/images/product/purchasing_material-requirement-planning/build-01.png?ver=2024050901)